We overhauled eight double-disc gate valves and one single-disc gate valve during the Belgian petrochemical plant shutdown in 2023.
After disassembly, each valve was carefully inspected for damage. After the damage was assessed, the repair steps were determined and carried out.
When the repair work was completed, the FAT (Factory Acceptance Tests) were carried out in the presence of the customer. The complete documentation of the repair work was made available to the customer.
Petrochemical
Belgium
Overhaul of valves for petrochemical plant in Belgium
2023